CONDO PACKAGES

We have provided these easy packages for you to be able to gauge your budget and final outcome of your home. 

You may contact our representatives to go through any additional add ons that you may require.

2 TOILET
click for more details

1 KITCHEN & 2 TOILETS
click for more details

1 KITCHEN
click for more details

 

1 KITCHEN & 2 TOILET

$21,688

Hacking Works.
- To apply for HDB permit.
- To supply 02 mmes haulage services and clearing of debris.
Kitchen
- To hack & dispose 01 set of kitchen cabinet inclusive of disposing of cooker hood, hob & sink, 02 nos wash basin & 02nos toilet bowl.
- To hack & dispose existing kitchen floor tiles.
- To hack & dispose existing kitchen wall tiles.
Toilet.
- To hack & dispose existing 02nos toilet door & door frame
- To hack & dispose existing 02nos toilet floor tiles.
- To hack & dispose existing 02nos toilet wall tiles.
Masonry Works / Flooring Works.( Homogenous Tiles @ $3.00 psf w/gst ) 
- Top up for mandatory use of 3in1 cement (as per HDB ruling effective 1st June 2015) for kitchen & 2 toilets.
Kitchen
- To supply & lay 2-layers waterproofing membrane for kitchen.
- To supply labour & materials to plaster finish kitchen wall with sealer & paint finish.
- To supply & lay selected homogenous floor tiles at kitchen inc 7% wastages.
- To construct 10ft L 50mm cabinet mortar base with tiles finish.
- To construct 50mm fridge mortar base with tiles finish.
- To construct 50mm washing machine mortar base with tiles finish.
Toilet.
- To supply labour & materials to make good hacked door frame at 02nos toilet with cement & plaster finish.
- To supply & lay waterproofing membrane at 02nos toilet.
- To supply & lay selected homogenous wall tiles at common toilet inc 7% wastages.
- To supply & lay selected homogenous floor tiles at common toilet inc 7% wastages.
- To supply & lay selected homogenous wall tiles at master toilet inc 7% wastages.
- To supply & lay selected homogenous floor tiles at master toilet inc 7% wastages.
- To construct & install 02nos shower kerb/drop with tiles finish.
- To construct & install 02nos entrance kerb with tiles finish.
Sanitary
Kitchen 
- To supply & install stainless steel cold water pipings at kitchen & 2 toilets.
- To supply labour to install kitchen sink and tap only with new inlet and outlet piping.
- (supply by client)
Toilet.
- To supply labour only to install 02nos. of wash basin and tap. 
- To supply labour only to install 02nos. toilet bowl
- To supply labour only to install 02nos. bidet spray.
-  To supply labour only to install toilet accessories.
Carpentry works
Kitchen
- To construct & install 10ft L top kitchen cabinet complete with selected laminated finish & ABS door edgings
- To construct & install 10ft L bottom kitchen cabinet complete with selected laminated finish & ABS door edgings
- To supply & install 03 nos. anti-slam drawer mechanism complete with soft closing hinges for kitchen cabinet.
- To fabricate & install 1 x aluminium frame door with frosted glass insert comes with 2 nos hydraulic hinges and stainless steel dish rack
- To supply & install 10ft L length of selected solid surface/granite kitchen top.
- To supply labour only to install hob & cooker hood.
Lightings & Electrical works
Kitchen
- To supply & install 01 no. cooker hood point with switch point.
- To supply & install 05 nos. of 13Ax2. 
- To supply & install 02nos. of new Lightings points.
- To supply labour only to install 2nos. of Lightings.
Toilet
- To supply & install 02nos. of new Lightings points.
- To supply labour only to install 02nos. of Lightings.
Door Works.
- To supply & install 02nos aluminium frame bi-fold door with acrylic insert panels.
Misc Works.
- To supply & install floor protection with corrugated paper at affected area.
- To provide general cleaning for affected area including acid wash.
- To supply labour and material to paint the whole kitchen with Nippon Vinilex Paint.
- (1 colour + sealant)